AS/NZS 4911:2003 (Reference Use Only)

AS/NZS 4911:2003 (Reference Use Only)

General conditions of contract for the supply of equipment without installation Australian/New Zealand Standards

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$65.73 tax incl.

$152.86 tax incl.

(price reduced by 57 %)

1000 items in stock

Sets out general conditions of contract for the supply of equipment which is purpose-built or manufactured, including equipment such as building elements. Where equipment is being supplied for use at different times or stages, separable portions may be appropriate. If installation is required, AS 4910-2002 for supply of equipment with installation, should be used.




People Who Bought This Also Bought:
AS 4300 Supp 1-1995 (Reference Use Only)- General conditions of contract for design and construct - Annexure Part A (Supplement to AS 4300-1995)AS 4910-2002/Amdt 1-2005- General conditions of contract for the supply of equipment with installationAS 4300 Supp 5-1995 (Reference Use Only)- General conditions of contract for design and construct - Annexure Part E (Supplement to AS 4300-1995)AS 4300 Supp 4-1995 (Reference Use Only)- General conditions of contract for design and construct - Annexure Part D (Supplement to AS 4300-1995)AS 4300 Supp 2-1995 (Reference Use Only)- General conditions of contract for design and construct - Annexure Part B (Supplement to AS 4300-1995)AS 4300 Supp 3-1995 (Reference Use Only)- General conditions of contract for design and construct - Annexure Part C (Supplement to AS 4300-1995)AS 4300-1995 (Reference Use Only)- General conditions of contract for design and construct

Contact us