BACnet for Renovation: Mixing Old and New

BACnet for Renovation: Mixing Old and New

Randy Amborn ASHRAE / 2006 / 3 pages

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$3.44 tax incl.

$8.00 tax incl.

(price reduced by 57 %)

1000 items in stock

Park Towers are two, 18-story, 270,000 ft2 (25 000 m2) commercial office towers in the upscale Galleria area of Houston. Built in the 1970s, they were fully operational buildings until the late 1980s. The buildings sat vacant and abandoned for more than 11 years until TPMC Realty Corporation purchased them in 1998. After a total asbestos abatement and a demo of the total interior shell of the buildings, the TPMC development team performed a total renovation of these assets. Inclusive in this renovation was a new expanded curtain wall (adding approximately 55,000 ft2 (5100 m2) of lease space), roof, chillers, elevators, cooling towers and new M/E/P systems for the building. The buildings were reopened in January 2000.

Citation: ASHRAE Journal, Vol. 48, No. 11, Nov. 2006, pp. B4-B8



Product Code(s): D-28883


People Who Bought This Also Bought:
ASHRAE - March 2001: Commissioning Interoperable SystemsASHRAE 62.1-2007- Standard 62.1-2007 -- Ventilation for Acceptable Indoor Air Quality (ANSI Approved)ASHRAE - Standard 90.1-2004 User's ManualANSI/ASHRAE 62.1-2004- Standard 62.1-2004 -- Ventilation for Acceptable Indoor Air Quality (ANSI Approved)ASHRAE - Context Tagging Within BACnetANSI/ASHRAE 15-2001- Standard 15-2001 -- Safety Standard for Refrigeration Systems (ANSI approved) [CONTINUOUS MAINTENANCE STANDARD]ASHRAE - BACnet Today: Significant New Features And Future EnhancementsASHRAE - XML and Building AutomationANSI/ASHRAE 90.1-2007 (I-P)- Standard 90.1-2007 (I-P Edition) -- Energy Standard for Buildings Except Low-Rise Residential Buildings (ANSI Approved; IES Co-sponsored)ASHRAE - BACnet: Issues and Answers

Contact us