Commissioning: Hospital Retrocommissioning

Commissioning: Hospital Retrocommissioning

By Tom Hanlon; Ed Tinsley, P.E.; Tim Staley, P.E. ASHRAE / 2010 / 3 pages

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$3.44 tax incl.

$8.00 tax incl.

(price reduced by 57 %)

1000 items in stock

The commissioning project of Mercy Hospital in Fort Scott, Kan., cost $207,789. It was projected to save $181,310 each year. Actual annual energy savings are $389,000. Simultaneous heating and cooling costs associated with high minimum airflow rates and improper control sequences were the most significant problems.

Units: Dual

Citation: ASHRAE Journal, vol. 52, no. 5, May 2010