Data Centers: Staying On-line: Data Center Commissioning

Data Centers: Staying On-line: Data Center Commissioning

By Mark Hydeman, P.E., Member ASHRAE; Reinhard Seidl, P.E., Member ASHRAE; and Charles Shalley, P.E. ASHRAE / 2005 / 6 pages

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$3.44 tax incl.

$8.00 tax incl.

(price reduced by 57 %)

1000 items in stock

Data centers require tight coordinationbetween the trades, special consideration for redundancy and reliability, and carefully scripted commissioning of systems. Consider, for example, the issue of redundancy. For non-critical commercial facilities, the design for redundancy typically is approached on an equipment basis.

Citation: ASHRAE Journal, Vol. 47, No. 4



Product Code(s): D-24701

This product is related to: Commissioning High-Tech Facilities

People Who Bought This Also Bought:
ASHRAE - OA Economizers for Data CentersASHRAE - Best Practices for Datacom Facility Energy Efficiency, 2nd Ed.ASHRAE - NY-08-004 -- Method for Optimizing Equipment Cooling Effectiveness and HVAC Cooling Costs in Telecom and Data CentersASHRAE - Meeting the Needs Of 24/7 Data CentersASHRAE - DE-05-08-4 - Commissioning Combined with CFD for Datacom Performance, Adaptability, and ReliabilityASHRAE - SL-08-018 -- Airflow and Cooling Performance of Data Centers: Two Performance MetricsASHRAE - Guideline 1.1-2007 -- HVACR Technical Requirements for The Commissioning ProcessASHRAE - Commissioning High Performance BuildingsASHRAE - Trend Analysis for CommissioningASHRAE - Thermal Guidelines for Data Processing Environments, 2nd Ed.

Contact us